GT is proud to announce that it has been awarded the contract to line a substantial attenuation tank at Chelsea Football Club's training ground in Surrey.

Geosynthetic Technology Limited installed more than 860 square metres of Geotextile and PE Liner on behalf of main contractor J. Devine Civil Engineering Limited. The 117 cubic metre attenuation tank was designed to accept storm and rainwater run off as part of Chelsea FC Youth Academy’s SUDS project.

Geosynthetic Technology Limited oversaw the excavation of the site area, installed all of the Geotextile and Geomembrane lining, and installed attenuation blocks. This Geomembrane and Geotextile lining project benefits from a bona-fide 20 year Warranty, our company’s Professional Indemnity and Public Liability insurance. However due to the underground positioning of this attenuation tank, the lining system is out of reach of direct ultraviolet light, and is therefore, expected to have a working life in excess of 100 years.

Take a look at our Case Study for this project for more information on the success of this project.

Geosynthetic Technology Limited can line attenuation block tanks from all Manufacturers and Suppliers and our service typically includes the installation of contractor supplied attenuation blocks. If you have an attenuation tank lining project then contact us today with your requirements.

Lined Area: 0,000 square metres
Materials used: 3600N Geotextile / 0.50mm PE Liner
Ground Works Contractor:  J. Devine Civil Engineering Ltd, Cheam, Surrey