Work will commence on Monday 11 February to line a 9,500 square metre irrigation reservoir at Woolverstone, Suffolk. The project comprises a 24,500 cubic metre reservoir for agricultural irrigation purposes. The reservoir has a total land take-up of approximately 160m x 80m. The reservoir will be lined with a 300g/m2 polypropylene geotextile underlay and a 1.00mm LLDPE liner. The materials are covered by a bona-fide 20-year warranty. Tyre lines at 10m centres will be placed over the lined slope faces, for safety purposes to enable anyone who may fall in the reservoir to climb out. This project has an estimated two week duration for the installation of the materials and tyre lines. This is the fifth reservoir lined by GT for the end Client, AW Mayhew (Farms) Limited. |