GT has been selected to line Attenuation areas at this new build school in Exeter. Three seperate external rainwater SUDS areas (totalling some 3,000 square metres) are to be lined with Excelastic 1.00mm and a protective geotextile layer. A 300mm open graded sub-base will be placed over the lining system to provide storage for rainwater.